Home Technologies Companies Locations Map Explorer FAQ ChatGPTChatGPT Help Login Register
Theme
Light Dark Auto
Quick Menu
Loading...
Loading...

OSSPV001 LIMITED

4 unique locations (34 components)

Active MW: 7.13 MW
Inactive MW: 20.94 MW
Port of Tilbury, Tilbury, RM18 7EH (5 components)
• New Build Generation CMU, advanced battery energy storage system.
• Site demand offset by onsite behind the meter advanced battery energy storage system.
Inactive •
Tilbury Freeport Tilbury Essex RM18 7HE (22 components)

Demand side response in reduction of demand with the private HV network at the Port Of Tilbury. This is a battery energy storage system with communications to the port's metering …

Active • 2024-25 (T-1), 2025-26 (T-4) ...
7.13 MW
Loading map...
Showing 4 locations